BUILDREFS Free Tools
Earthwork

Shrinkage Factor

The reduction in volume when excavated soil is recompacted as fill, compared to its bank (in-place) volume.

🏗️

In the Field

Shrinkage means you need more cut material than fill volume suggests. If a fill requires 1,000 cubic yards compacted, you may need to excavate 1,100–1,150 bank cubic yards to get there.

📐

Rule of Thumb

Most cohesive soils shrink 10–15% when recompacted. Granular soils shrink less — approximately 5–10%. Use geotechnical report data for accurate estimates.